Products

OTA and the store build, on the same clock.

An over-the-air update and a native build reach different people, on different days. Deploy puts both timings on the release, so nobody calls it shipped while one path is still waiting.

Two shipments. One announcement.

01

The over-the-air update goes out on Tuesday. The store build is still in review on Thursday. Support hears that it shipped.

02

One person publishes the bundle. Someone else cuts the binary. The times live in two calendars.

03

A temporary update and the native fix protect different people. Treating them as one release leaves a group out.

The timings

Who each path reaches, and when.

Attach both paths to the release. The channel shows who can take the over-the-air update now, who still needs the store build, and the time each one is meant to land.

  • Reachable now

    On a version that can take the over-the-air update. Named owner, named time.

  • Waiting on the store

    The native build is the only path. Its review clock is separate from the bundle.

  • Already covered

    On a version that does not have the bug, or that already has the fix.

  • Aligned before the announcement

    The release is not called live until both timings say so.

#mobile-releases10:22
RSReleaseStepsAPP
v4.12.0 — checkout
Over the air
Reachable now 42% · Dana
Tue 14:00
Native build
Needs the store 18% · Dana
After approval
Announce when both are live. @sam holds the go-live.

Line the two clocks up before anyone says it is live.

01

Attach both paths to the release

Say whether the change can go over the air, needs a new build, or both, and which version the temporary one is allowed to hit.

02

Read the split and the times

Who can be reached now, who waits on the store, and when each move is meant to land. The two shipments stay separate.

03

Hold the announcement to both

Publishing the bundle is one owner. The store build is another clock. Go-live waits until the timings you set both say the release is out.

The same timings, for the people who have to choose.

Deploy does not publish the bundle or submit the binary. It keeps the two release times in the channel the team already reads.

Developer

Sees the over-the-air update and the native fix as two shipments, with a time on each.

Release owner

Knows which group each path reaches before anyone announces the feature.

Go-live

Decides when the store rollout and the temporary change are both ready to call live.

Before you call it shipped

Does ReleaseSteps publish the over-the-air update?

No. Deploy posts who the update reaches, who still needs the store build, and when each path is meant to land. Publishing the bundle stays with the person who already does that.

What if the store build is still in review when the OTA is ready?

The channel keeps both timings. The over-the-air update and the native build are separate shipments. Calling the release live waits until the times you set both say so.

Can one person own both paths?

Yes. The post still names each move, so the temporary update and the store build do not get announced as one shipment.

Reduce mobile release stress.

Add ReleaseSteps to Slack and run your next release in the open — calm, clear, and in one channel.

Install ReleaseSteps Agent